Jump to content
RemedySpot.com

Mold halts opening of multi-million dollar church

Rate this topic


Guest guest

Recommended Posts

Mold halts opening of multi-million dollar church

Last Update: 10/31/2005 12:15:44 PM

ville, FL

Watch Video

http://www.fox30online.com/news/local/story.aspx?content_id=2D926F21-

2E50-47DC-9CB3-E1B8D78DA1DC

A brand new multi-million dollar church is going unused by members

in Saint 's County, with no clear opening date in site.

The members at San del Rio Catholic Church have be worshiping

God in very cramped quarters of late due to an overflowing

population in Saint 's County that has pushed the church way

past capacity.

But the church's prayers were answered when they built a $5.5

million dollar mega church next door.

However, the church's doors are currently shut, and not opening any

time soon due to one very smelly culprit – mold.

Church leaders plan to meet with mold experts to figure out how to

alleviate the mold problem, and figure out when the massive church

will open.

Until the problem is fixed and the church gets a " certificate of

occupancy " , the congregation will continue to use the old building.

Link to comment
Share on other sites

Join the conversation

You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...