Jump to content
RemedySpot.com

Seeking Cooling Tower/Chiller application for energy-saving pilot

Rate this topic


Guest guest

Recommended Posts

Posting for a colleague. They have a product that helps facility managers save

energy and water, and reduce operating expenses for commercial and industrial

heat transfer applications.

For example, in one cooling tower treatment case-study, a residential facility

in Florida was able to reduce the current load demand of their 500 ton York

chiller from 100% to 63% resulting in over 25% energy savings in less than four

weeks. In fact, for the first time they were able meet their cooling demand

using only one of their two chillers. And the projected first year energy

savings was estimated to be around $100,000.

Additionally, they can typically reduce cooling tower blow-down by 50%-90%,

adding over $10,000 in annual water savings.

They are seeking a site that can be monitored in order to document energy

savings and generate site data. A location currently monitored by an ME would be

ideal. Serious parties should please email: edwards.doug@...

Thanks,

Doug

Link to comment
Share on other sites

Join the conversation

You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...